464 Job openings found

1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
4.20 LPA TO 6.00 LPA
Role of a Quantity Surveyor (QS) at work Before starting any construction project, the quantity surveyor analyzes the drawing and specifications of the new building that architects or engineers provide. The surveyors calculate the quantity of the material used in the building. Also, they must calculate the actual work or labor cost. Quantity ...
5 Opening(s)
5.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Job Title: Quantity Surveyor (Experienced in the construction of Cross-Country Pipelines) To apply share resume on cv1@m3consultant.net Location: Kingdom of Saudi Arabia (KSA) Qualification: Mechanical, Electrical & Instrumentation, Civil & Structural Position Summary: We are currently seeking a dynamic and experienced Quantity Surveyor specializing in the construction of Cross-Country Pipelines to join our team. The ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.50 LPA TO 4.50 LPA
Degree in relevant Engineering Discipline with minimum 3years’ experience or diploma in relevant Engineering Discipline with minimum 6 years’ experience in quantityestimation, field measurement etc. Before starting any construction project, the quantity surveyor analyzes the drawing and specifications of the new building that architects or engineers provide. The surveyors calculate the quantity of ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
Responsibility: Rate Analysis, Costing, Quantity Surveying, Client Billing, Sub Contractor Billing, QS, Bar Bending Schedule, BOQ Preparation Responsibilities and Duties • Monthly Client Bills • Sub-contractors & sub agencies bills • Monthly Reports • RMC, reinforcement steel • Rate Analysis for non tendered items • Reconciliation of Materials • Variation Order • Daily Progress report • Check and review the ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 3.00 LPA
Qualification: BE CivilExperience: 2 to 5 yrsSalary:Rs 2.50 to 3.0 LPAWork location: near Chandani chowk in PuneOrganization Structure: Jr. Engineer reports to QS & Estimation Head. Purpose:1. Responsible for providing BOQ of all Construction Activity to prepare initial Budget on given timeline.2. Responsible for providing BOQ of all Construction Activity to ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
  Area Manager Job Description Position: Slag Concentrator, Area Manager   Position Qualifications:   The successful candidate will require Bachelor Science degree in one of the following: Mechanical / Civil / Structural Engineering discipline. Experience of 15 – 20 years-relevant experience is desired. Field construction experience successfully managing mining, or refinery and or industrial projects in ...
2 Opening(s)
10.0 Year(s) To 14.0 Year(s)
0.00 LPA TO 0.00 LPA
Profile Summary, Prepare contract documents, including bills of quantities for REMEASURABLE / UNIT RATE CONTRACTS.  Undertake cost analysis for Construction and EPC project.  Prepare and Manage control Budget.  Prepare and manage Resource Budget (Manpower & Equipment).  Prepare Monthly Cost reports.  Forecast costs within reports – project actual cost against planned costs to provide accurate forecasts with ...
2 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 6.00 LPA
Educational Qualification Essential Diploma in Civil Engineering with 8 years experience. Essential Experience a) Total Professional Experience 8 years b) Experience in Highway Projects Min 05 years as quality control works in bridge construction projects with sufficient experience in hill roads construction projects with sufficient experience in hill roads construction. c) Experience in similar capacity ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Qualification: BE in Civil preferred,Experience: min 6 to 10 years of work experience in QS & Planning activities from large Real estate developer / Construction company.Work location: Sion east in Mumbai Job Purpose: To assist in quantity estimation and surveying process with minimal planning management for all projects PRIMARY KPAs• Vetting of ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 8.00 LPA
of managing all costs related to civil engineering and building projects from the first calculations to the final numbers. Quantity surveyors are tasked with reducing the overall cost of a project thus ensuring value for money.  responsibilities will vary depending on the type of project and its current stage, here are ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile