47 Job openings found

1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
10.00 LPA TO 20.00 LPA
1. NEW PRODUCT DEVELOPMENT RC grades to develop within 3 months time with commercial supply Other MCC combination product range to develop including MCC + Lactose, MCC Spheres,   Technical support including market complain to provide when & where is required Market support and explore to promote MCC, Powdered Cellulose ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 1.20 LPA
ITI Fitter .Preferred experience in overhead line, panel refurbishment, control wiring, power wiring of mcc panels, plc panels. RoleWorkman/Foreman/Technician Industry TypeOil and Gas, Energy, Power, Infrastructure Functional AreaProduction, Manufacturing, Maintenance Employment TypeFull Time, Permanent Role CategoryProduction/Manufacturing/Maintenance Education UG :B.Tech/B.E. in Electrical PG :M.Tech in Electrical Key Skills PanelsBusiness IntelligenceControlSix SigmaPLCITI electricalProductionManufacturingMCCSupply Chain
10 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Profile:   Maintenance of galvanizing line. Maintenance of Maintenance of D.C. machines (up to 1600 KW DC motor.)  Maintenance of Maintenance of A.C motor (2500 KW AC motor.)  Maintenance of DC & AC Drives, power & auxiliary panels.  Maintenance of roll grinding machine Attending Breakdown maintenance & shutdown maintenance. Maintaining Safety aspects & House Keeping of the line. Maintenance of crane. Making technical Specifications and technology appraisal for plant equipment and utilities. Maintenance of Ac Drive, Dc Drive like ABB, Allen Bradley, Siemens micro Master Drive, Tele mechanique Drive BRM & WRM Electrical Maintenance Successfully completed BAR MILL Project Erection & commissioning of MCC,PCC, Transformers Drives Control wiring from RIO to Field - Proxy, HMD and solenoid valves..  Did the communication wiring & Control wiring.                                                                              MCC Control wiring & RIO'S Termination & Cabling  AC motors installation & maintenance. Encoders Cabling & Termination  OS Internal/External wiring Wiring of Siemens PLC S7-400 Handled wiring of field devices like control valves, flow meters. Looked after power cable laying & termination for power distribution panels (PCC & MCC), motors, transformers, Ac drives and HT panels. And control cables for PLC, RIO'S and various field equipment Coordinated with SIEMENS & MORGAN for Commissioning of Bar Rod Mill       Hydraulic and Lubrications motor maintenance EOT cranes & Magnetic cranes, Electrical maintenance & Troubleshooting Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in  
5 Opening(s)
5.0 Year(s) To 15.0 Year(s)
1.00 LPA TO 15.00 LPA
Greetings from MM Management!! I am Naresh from MM Management. MM Management is into Global Recruitment Services providing manpower across the Globe. Your profile is shortlisted for the initial screening of QC Instrumentation position with our esteemed client. Job Role: QC Instrumentation (CBT Test Passed with SAP Preferred) experienced in the construction of Cross-Country ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
JOB DESCRIPTION/RESPONSIBILITIES * Operation and Maintenance of 66 KV switchyard, HT & LT switchgears, SF6, transformer, motors, EOT cranes, Battery & Battery charger, UPS,PCC, MCC, Plant lighting & PLC, Electro hydraulic grab and crushing equipment.* Responsible for Maintenance and operation knowledge in gensets, electrical Panels, Transformers, isolators and lightning arrestors.* Maintenance ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
JOB DESCRIPTION/RESPONSIBILITIES * Operation and Maintenance of 66 KV switchyard, HT & LT switchgears, SF6, transformer, motors, EOT cranes, Battery & Battery charger, UPS,PCC, MCC, Plant lighting & PLC, Electro hydraulic grab and crushing equipment.* Responsible for Maintenance and operation knowledge in gensets, electrical Panels, Transformers, isolators and lightning arrestors.* Maintenance ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
Not Disclosed by Recruiter
Candidate should have knowledge of  GA / SLD / BOM  Drawing of PCC / MCC. Candidate should have knowledge of  Mounting Arrangements of Components. Candidate should have knowledge of  AutoCAD, Trench layout, Single Line Diagram, Different Relays. Candidate should  have to  review and approval of electrical drawing. QUALIFICATION: Diploma / ITI DESIRABLE EXPERIENCE: 3 ...
3 Opening(s)
2.5 Year(s) To 3.5 Year(s)
5.00 LPA TO 7.00 LPA
Role : Application Developer  Role Description : Design, build and configure applications to meet business process and application requirements.  Must have Skills : Enovia  Good to Have Skills :  No Technology Specialty  Job Requirements : Key Responsibilities : 1 Guiding the team in development / customization using Enovia 2 Work ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
5 Opening(s)
5.0 Year(s) To 8.0 Year(s)
20.00 LPA TO 24.00 LPA
Job Description: Instrumentation Engineer Minimum Requirements: Bachelor’s degree in Electronics or Instrumentation & Control Engineering from a recognized University or Equivalent professional qualification.  5 - 8 years experience in design of Instrumentation and control system.  Conversant with International Design Codes of Practice, including American, British Standards and Saudi Aramco standards and SABIC standards. Hands on ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile