1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
4.80 LPA TO 6.00 LPA
-Dip/B.E in Mechanical Eng or Fabrication technology with 5 to 7 years experience
-Preparation of WPS,PQR for different types of Materials.
-Preparation of Weld Book, Weld Plan and Weld map.
-Communation with Client and TPI .
-Ansure to Shop floor welding activity.
For more details call on 7043214151 or send your cv on netal@postaresume.co.in
5 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
• Using and maintaining specialised machines and tools• Assembling components so they are ready for installation• Reading and interpreting project plans• Coordinating with the labour crew for efficient installations• Performing MIG, TIG and other types of welding methods depending on the project• Finding and fixing faults in pipework• Carrying out ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 3.40 LPA
Job Summary:
As a Welding Engineer, you will be responsible for ensuring the successful welding of cast components, overseeing welding processes, conducting quality inspections, and collaborating with cross-functional teams to optimize welding operations. Your expertise will play a critical role in maintaining the integrity and quality of our casting products.
2 - ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 2.80 LPA
Job description
08.04.24
HPS/2024/214
Die Fitter
Male
1
0 to 2
ITI
MAIN RESPONSIBILITY/JOB SUMMARY :- Preparation of new dies and release to production.- Trouble shooting in extrusion process for any issues wrt. Quality and Performance.- Extrudate parameters monitoring like shrinkage & Conveyor speed study.- Rework data monitoring and action plan for reduction.- Perishable tooling's monitoring for extrusion ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.20 LPA TO 4.80 LPA
The job description for a PDC (Pressure Die Casting) Die Maintenance Technician typically includes the following responsibilities:
Die Maintenance: Performing routine maintenance, repairs, and troubleshooting on pressure die casting dies to ensure optimal performance and longevity.
Die Inspection: Conducting regular inspections of dies to identify wear, damage, or defects and performing necessary ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
Responsibilities
Reviewing the blueprints of various mechanical systems
Constructing and joining structural components
Examining and measuring components to ensure that they are of the correct size and quality
Using welding equipment and hand tools like ball-peen hammer, hack saw, and steel ruler while constructing structural components
Performing regular maintenance checks
Identifying system malfunctions and rectifying the ...
2 Opening(s)
0 To 2.0 Year(s)
Not Disclosed by Recruiter
Job Description:-
Analysing the blueprints for mechanical systems to determine the specifications of the components to be constructed.
Constructing structural components from raw materials.
Using welding equipment to fuse structural components.
Inspecting fabricated components to ensure that they are the correct size.
Utilizing shears, power saws, cutting torches, and chipper knives to cut structural ...
2 Opening(s)
7.0 Year(s) To 15.0 Year(s)
1.00 LPA TO 22.00 LPA
Designation: Structural QC Inspector
Job Location: Dammam(Saudi Arabia)
Experience: 7+ Years
Job Description
Job Summary: We are seeking an experienced Structural QC Inspector with Aramco approval to join our team. The ideal candidate will have a minimum of 7 years of relevant experience in structural quality control inspection within the oil and gas industry. The primary responsibility of ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 11.00 LPA
Job Details:
Responsible for the overall machine’s maintenance in steel division of the company including workshop & site.
Required Qualification & Work Experience:
A minimum of 8 to 10 years of total working experience with at least last 5 to 8 year’ s of experience in similar position like Maintenance In charge / ...
3 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Duties and Responsibilities• Design, Promote and Carry out Preventative Maintenance• Ensure all machines are safe and fit for purpose• Installation of new machines and equipment• Overhaul and upkeep and repair of all plant machines including;1. Tube Washer m/c.2. Fining m/c.3. Cab Furnace .4. All utility equipment’s like Air Compressor ...