20 Job openings found

1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Maintaining the all operational parameters like temperatures and pressures in optimum range to produced quality of sinter. Maintaining and smoothly handling of Flux and Fuel Crushers and maintaining its crushing index as per required to process. Experience to handle the RMHSand maintaining its bin levels in healthy condition at the shift end. As ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
Not Disclosed by Recruiter
Hi We need the candidate to be at Plant Head level. Should have experience in maintenance of Blast Furnace / Sinter Plant. Ensure all the utilities required for maintenance should be available.  Strong experience into process and compliance. Like MTBF, MTTR, RCA (Root Cause Analysis), Pareto Analysis, Fish Bone Analysis, FMEA (Failure ...
2 Opening(s)
10.0 Year(s) To 12.0 Year(s)
3.60 LPA TO 4.20 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed Material,Ironpellet, Quatrzite, Flourspore & Pyroxinite. Bentonite,Carbondust,Diesel,,Furnace oil etc Instrumental Analysis: Operation of Instrument Like Proximate Analyzer (Leco TGA ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 6.00 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed Material,Ironpellet, Quatrzite, Flourspore &Pyroxinite. Bentonite,Carbondust,Diesel,,Furnanceoil etc Instrumental Analysis: Operation of Instrument Like Proximate Analyzer (Leco TGA 701),Ultimate Analyzer ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
10.00 LPA TO 15.00 LPA
Description:    - Work in close coordination with PPC, Mills and Blast Furnace, Sinter Plant for preparing monthly operational Plan for SMS- Ensure Technological Improvement in SMS- To study the technical feasibility and analyze the production & cost benefits of implementing latest processes, technologies & equipments in Steel Melt Shop- Interaction with ...
1 Opening(s)
2.0 Year(s) To 45.0 Year(s)
2.40 LPA TO 3.00 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed Material,Ironpellet, Quatrzite, Flourspore & Pyroxinite. Bentonite,Carbondust,Diesel,,Furnace oil etc Instrumental Analysis: Operation of Instrument Like Proximate Analyzer (Leco TGA ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 2.00 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed Material,Ironpellet, Quatrzite, Flourspore & Pyroxinite. Bentonite,Carbondust,Diesel,,Furnace oil etc Instrumental Analysis: Operation of Instrument Like Proximate Analyzer (Leco TGA ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Description:   Responsible of Analytical laboratory in testing of Minerals, Finish Material. Preparation of report Day wise & Monthly . Manganese Ore/Manganese Sinter- Mn,Fe. Sio2, Al2o3,Cao,Mgo,P,Loi Titanium Ore- Tio2, Fe. Sio2, Al2o3, Cao, Mgo, Mn, P, Loi. Lime Stone/Dolomite- Sio2, Al2o3,Cao,Mgo,Loi Bauxite - Sio2, Al2o3, Fe, P, Loi.   Coal/Coke – Proximate Analysis, GCV, Ash Analysis. Coke- CRI/CSR Physical Analysis – Sieve   Ferro Alloys- ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 25.00 LPA
 - Work in close coordination with PPC, Mills and Blast Furnace, Sinter Plant for preparing monthly operational Plan for SMS- Ensure Technological Improvement in SMS- To study the technical feasibility and analyze the production & cost benefits of implementing latest processes, technologies & equipments in Steel Melt Shop- Interaction with ...
1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
25.00 LPA TO 30.00 LPA
We Are Currently looking for Project Head for reputed Steel plant at ORISSA Location. commissioning of following Projects Working as Project Lead blast furnace,SINTER PLANT  F proper, cast house, Stoves, Slag granulation plant, Gas cleaning plant, TRT, Coal injection plant, water & utility system, AC and ventilation systems, Electrical & instrumentation works, CH FE system and ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile