303 Job openings found

1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 20.00 LPA
Require immediately for a leading STEEL INDUSTRIES and  a highly reputed Group for General manager (Metallugy/B.sc) for Operation /Sponge Iron Division 100*2, 350*4 tpd  at In charge of Operation Department of SID plant at RAIPUR Location ,                              ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 2.00 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed Material,Ironpellet, Quatrzite, Flourspore & Pyroxinite. Bentonite,Carbondust,Diesel,,Furnace oil etc Instrumental Analysis: Operation of Instrument Like Proximate Analyzer (Leco TGA ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
12.00 LPA TO 18.00 LPA
Urgent Requirement for GM Raw material for for iron ore,coal,  Iron Ore, Coal, Steel, Met Coke, Zinc, Ferro alloys, Pellets & Capital/Mining/Metallurgy Equipment,  Urgent Requirement for GM Raw material for for iron ore,coal,  Iron Ore, Coal, Steel, Met Coke, Zinc, Ferro alloys, Pellets & Capital/Mining/Metallurgy Equipment,   for Reputed Integrated Steel Plant at RAIPUR Location purchase & procurement .vendor developmentRaw Material, Price Negotiation, Procurement Planning.Implementing cost saving measures to achieve reduction or rejection of raw materials, negotiating with vendors; ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
14.00 LPA TO 15.00 LPA
Urgent Requirement for GM Raw material for for iron ore,coal,  Iron Ore, Coal, Steel, Met Coke, Zinc, Ferro alloys, Pellets & Capital/Mining/Metallurgy Equipment,  Urgent Requirement for GM Raw material for for iron ore,coal,  Iron Ore, Coal, Steel, Met Coke, Zinc, Ferro alloys, Pellets & Capital/Mining/Metallurgy Equipment,   for Reputed Integrated Steel Plant at RAIPUR Location purchase & procurement .vendor developmentRaw Material, Price Negotiation, Procurement Planning.Implementing cost saving measures to achieve reduction or rejection of raw materials, negotiating with vendors; ...
2 Opening(s)
10.0 Year(s) To 12.0 Year(s)
3.60 LPA TO 4.20 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed Material,Ironpellet, Quatrzite, Flourspore & Pyroxinite. Bentonite,Carbondust,Diesel,,Furnace oil etc Instrumental Analysis: Operation of Instrument Like Proximate Analyzer (Leco TGA ...
1 Opening(s)
2.0 Year(s) To 45.0 Year(s)
2.40 LPA TO 3.00 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed Material,Ironpellet, Quatrzite, Flourspore & Pyroxinite. Bentonite,Carbondust,Diesel,,Furnace oil etc Instrumental Analysis: Operation of Instrument Like Proximate Analyzer (Leco TGA ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 6.00 LPA
Chemical analysis of product like Spong Iron ,Pig Iron, Bf Slag, Coke, Sinter, Metal and Chemical analysis of Raw Material Like Iron Ore , Coal, Pellet Ore, Coking Coal, Dolomite, Lime Stone , Mangneese Ore, Bed Material,Ironpellet, Quatrzite, Flourspore &Pyroxinite. Bentonite,Carbondust,Diesel,,Furnanceoil etc Instrumental Analysis: Operation of Instrument Like Proximate Analyzer (Leco TGA 701),Ultimate Analyzer ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
9.60 LPA TO 12.00 LPA
urgent Requirement for Marketing Manager raw material for Reputed Integrated Steel Plant at Raipur Location  Iron Ore, Coal, Steel, Met Coke, Zinc, Ferro alloys, purchase & procurement. vendor developmentRaw Material, Price Negotiation ,Procurement Planning.Implementing cost saving measures to achieve reduction or rejection of raw materials, negotiating with vendors; developed a cost saving tracker. Sourcing vendors Handling marketing of Raw Material. marketing Negotiation Communication with vendors for orders Coordinate with ...
2 Opening(s)
20.0 Year(s) To 25.0 Year(s)
36.00 LPA TO 70.00 LPA
Description:   Urgent Requirement for GM Raw material for for iron ore,coal,  Iron Ore, Coal, Steel, Met Coke, Zinc, Ferro alloys, Pellets & Capital/Mining/Metallurgy Equipment,   for Reputed Integrated Steel Plant at sAMBALPUR Location purchase & procurement.vendor developmentRaw Material,Price Negotiation,Procurement Planning.Implementing cost saving measures to achieve reduction or rejection of raw materials, negotiating with vendors; developed a cost saving tracker. Sourcing vendors Handling Purchase ofRaw Material. Price Negotiation Communication with vendors for orders Follow-ups for dispatch of ...
5 Opening(s)
5.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.00 LPA
Urgent Requirement for process shift engineer integrated steel  at Ahmadabad location sponge iron metallurgy, pallet plant cement plant process in kiln quality describe in quality      Urgent Requirement for process shift engineer integrated steel  at Ahmadabad location sponge iron metallurgy, pallet plant cement plant process in kiln quality describe in quality 

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile