6 Job openings found

3 Opening(s)
1.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 4.50 LPA
Hiring for Senior Production Engineer & Line Supervisor & Purchase Engineer in Aurangabad Production (LPC ONLY) 01 Post Gender: Male Education: BE /Diploma (Electrical) Experience: 4 to 5 Years in Specifically Wiring Harness Background Line supervisor (JD ASSEMBLY) 02 Post Education: BE /Diploma (Electrical) Experience: 1 to 2 Years in Specifically Wiring Harness Background Gender: Male Education: BE /Diploma ...
3 Opening(s)
0 To 1.0 Year(s)
1.44 LPA TO 1.68 LPA
Hiring for Quality Engineer Electrical Fresher in Aurangabad Quality Engineer Electrical Fresher 03 Post Gender: Male Education: BE Electrical Experience: Fresher Bus & Canteen available Job Location: Aurangabad, Shendra MIDC   if you are interested kindly collect your Interview Letter from our office For more details call on 9765567699 / 9765567505 / 9765567505
3 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Hiring for Maintenance Engineer in Wiring Harness Industries Maintenance Engineer  02 Post Education: Diploma or BE Electronic / Electrical / Mechanical Experience: Min 3 Years Specifically Auto Electrical or Wiring Harness Background Salary: up to 3.60 LPA JD: Having knowledge about pre-assembly crimping defects and their solutions.   Preventive Maintenance and breakdown attend on all type Applicators(04 types,Kam,   90 type, 25 ...
5 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Hiring for Production Supervisor in Wiring Harness Industries Production  01 Post Education: Diploma or BE Electronic / Electrical / Mechanical Experience: Min 3 Years Specifically Auto Electrical or Wiring Harness Background Salary: up to 4.00 LPA   JD: Allocation of the manpower according to the dispatch as well as production planning. Monitoring of production plan on a daily basis. Work-out production plan according to the material availability, customer demand, customer supply dates. Providing production plan to the concerned department such as change management, maintenance, dispatch, Logistics Production planning as per dispatch plan. Shift planning. Involvement in machine JH & PM (Kodera, Komax,mecal,applicators &Usw) Project implementation monitoring& TPM implementation. New product development. Preparation of production & maintenance data. Selection of Components, Wires, Terminals, Fuse, Circuit breakers, Switches, etc. Considering customer requirement, checking all parameters & set as per machine capacity. Improvements In PULSAR Line Quality as well as Quantity. Also involved in the TPM CHALLENGE AWARD activity for the company. Involve in the model line activity.   Job Location: Chakan Pune For more details call on 9765567699 / 9765567506 
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic / Electrical / Mechanical   Gender: Male   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as an associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase, Store & account dept. for new material requirement •To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Shendra MIDC, Aurangabad   for more details call on 7249840222 / 9765567505
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic   Gender: Female   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase , Store & account dept. for new material requirement •To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Chitegaon MIDC , Aurangabad   for more details call on 7249840222

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile