DM PLANT OPERATOR - RAIGARH

DM PLANT OPERATOR - RAIGARH

2 Nos.
79758
Full Time
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.00 LPA
Steel/Metal/Iron/Non-ferrous
Any - Any Graduation
Job Description:

Responsibilities:

  1. Operation of DM Plant Equipment: Operate and control demineralization plant equipment including filters, ion exchange units, pumps, valves, and associated instruments to ensure the production of demineralized water meets required standards.

  2. Monitoring Parameters: Monitor and control parameters such as flow rates, pressure differentials, pH levels, conductivity, and quality of water to ensure compliance with specified standards and optimize plant performance.

  3. Routine Inspections: Conduct routine inspections of DM plant equipment, pipelines, and associated components to identify any abnormalities, leaks, or malfunctions. Take necessary corrective actions or report issues to maintenance teams for timely repairs.

  4. Regeneration of Resins: Perform regeneration of ion exchange resins as per the schedule to maintain their effectiveness and longevity. Handle chemicals safely and ensure proper disposal procedures are followed in accordance with environmental regulations.

  5. Calibration and Maintenance: Calibrate and maintain instrumentation and control devices such as flow meters, pressure gauges, pH meters, and conductivity meters to ensure accurate readings and reliable operation of the DM plant.

  6. Troubleshooting: Troubleshoot equipment malfunctions and process deviations, diagnose problems, and implement corrective measures to minimize downtime and maintain continuous operation of the DM plant.

  7. Safety and Compliance: Adhere to all safety protocols, procedures, and regulations while carrying out plant operations. Ensure compliance with environmental standards and regulations governing water treatment and discharge.

  8. Documentation and Reporting: Maintain accurate records of plant operation parameters, maintenance activities, chemical consumption, and water quality analysis. Generate reports as required by management or regulatory authorities.

  9. Team Collaboration: Collaborate with other plant personnel including maintenance technicians, engineers, and supervisors to coordinate activities, share information, and achieve common production goals.

Qualifications and Skills:

  • High school diploma or equivalent qualification required; additional technical certification or training in water treatment or related field preferred.
  • Proven experience in operating and maintaining demineralization plant equipment, preferably in a steel manufacturing or similar industrial environment.
  • Strong understanding of water treatment processes, ion exchange principles, and chemical dosing systems.
  • Ability to interpret technical drawings, P&IDs, and equipment manuals.
  • Proficient in troubleshooting equipment malfunctions and performing routine maintenance tasks.
  • Good communication skills and ability to work effectively in a team environment.
  • Knowledge of safety regulations and practices related to chemical handling and plant operations.
  • Physical stamina and ability to work in a demanding industrial environment, including standing for extended periods and lifting heavy equipment when necessary.

 

JOB APPLY 

 http://jobs.vinayakjob.com/

 

MANISHA SAHU 9109993513

Company Profile

Existing plant of 33,500 TPA of MS Ingots (only 16,750 TPA is commissioned) & 4800 TPA
of TMT Bar has obtained Consent from Regional Office - Raigarh, Chhattisgarh
Environment Conservation Board (CECB) vide letter no. 153/RO/TS/CECB/--- Raigarh
dt. 16th May ---.
? Obtained Environment Clearance for 90,000 TPA Sponge Iron, 33,500 TPA to 1,23,500
TPA of MS Billets, 90,000 TPA TMT Bars / Structural --- / Wire Rod Mill, WHRB Power
Plant (6 MW) & FBC Power Plant (12 MW) from MoEF, New Delhi vide F.No. J11011/308/2009/ IA II (I) dated 29th March 2011& 9th July 2018 (Validity Extension).
? Obtained Consent for Establishment for 90,000 TPA Sponge Iron, 33,500 TPA to
1,23,500 TPA of MS Billets, 90,000 TPA TMT Bars / Structural --- / Wire Rod Mill,
WHRB Power Plant (6 MW) & FBC Power Plant (12 MW) from CECB vide
4291/TS/CECB/2014 dated 21st October 2014.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs

FITTER - RAIGARH
FITTER ,ITI FITTER,STEEL PLANT ,ITI
FABIRICATOR - RAIGARH
FABRICATOR,TECHNICAL,STEEL PLANT
Head EHS (Chemical Industry) at Khopoli / Raigad in Maharashtra
EHS Head,Environmental science,Industrial Safety,HSE strategy,Strategy Development,safety policy,Statutory Compliance,EHS Regulations,EHS compliance audits,HSE Procedures Development,Safety Training,Risk Assessment,Incident Investigation
GM - ACCOUNTS - RAIGARH
SR. MANAGER ,ACCOUNTS ,FINANCE
VP FINANCE & COMMERCIAL - RAIGARH
VICE PRESIDENT ,ROLLING MILL ,FINANCE AND COMMERCIAL,COMMERCIAL ,FINANCE ,VP