Urgent Job Opening As a Elecrical Engineer

Elecrical Engineer

1 Nos.
48560
Full Time
Job-60
1.0 Year(s) To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Engg Design / R&D / Product Mgt
Auto/Auto Ancillary
B.Tech/B.E. - Mechanical
Job Description:

job description *

* wiring harness or cable harness
* daily process inspections FP ,LP ,Hourly ( line verification sheet)
* line veryfication sheet standerd review
* rejection rework & maintain record
* ok not ok master sample avaibility , verification , date review
* 4 M change monitoring
* skill matrix verification operator level
* M/C fixture maintenance verification
* maintain defect sheet
* gauges fixtures calibration
* verification costomer and rejection &rework
* layout of final inspection as per plan
Company Profile

Products Manufacturer : Control panel, apfc panel, amf panel, ring

main unit, Compact substation panel, substation panel, flame proof

panel, vcb panel, synchronizing panel, v... Products Trader : Street

lights, vcb switchgear, outdoor vcb switchgear, compact substation,

substation, street glow lights, high bay lights, flood lights, Garage flood...

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs

Project Engineer (Solar) in Pune
Solar project engineer,Project Planning,BOM Preparation,Solar installation,Site visit
Site Engineer Solar in Pune
Site Engineer,Solar Energy,Solar Engineer,commissioning and monitoring solar projects
Design Engineer for New product development Plastic Bathroom Fittings, Pune
Design engineer,new peoduct development,Plastic Bathroom Fittings,CAD,3D Visualiser,CATIA,Plastic,Plastic Design
Incharge Welding shop at Pirangut in Pune
Welding Engineer,Welder qualification, Welding procedure, Material followup, GMAW welding, Drawing reading, welding symbols, design welding fixtures, ERP system, IWS / IWT or IWE qualification, Production Plan, Welders allocation in shift
PCB Testing Engineer in Pune
PCB testing,Test plan,Test Procedures,Equipment calibration records,R&D PCB testing