Sr. Engineer QS & Estimation for Infrastructure development firm in Pune

Sr. Engineer QS & Estimation

1 Nos.
2342
Full Time
4.0 Year(s) To 8.0 Year(s)
Not Mentioned TO Not Mentioned
Site Engg/Service/Project Mgt/After sales
Power/Energy - Solar/Wind/Hydro/Nuclear
B.Tech/B.E. - Civil
Job Description:

Qualification: B.E. Civil
Experience: 4+ Years

Purpose
1. Responsible for providing BOQ (Bill of Quantities) of all roads Construction Activity to prepare Initial Budget on given timeline.
2. Responsible for providing BOQ of all roads Construction Activity to prepare Final Budget on given timeline.
3. Responsible for providing accurate estimates & quantities of material to purchase & Labour to billing.
4. To support Site, ERP, Purchase, Contracts & Billing Dept. in Providing BOQ on given timeline.
5. To support Store Dept. in monthly Material Audit.
6. To support Construction Management in Reconciliation.
7. Responsible for all QS related activity.

Organization Structure
• The Sr. Engineer reports to the Estimation Head.

Main Responsibilities
1) Area calculation :
Work out Area to derive constant.
Work out Area for billing purpose for activity RCC work from Working & RCC drawing.
2) Quantity Survey :
Quantification of all Construction Activities to prepare initial & Final Budget.
Quantification of Material Qty of all construction activity and provide to Site, Purchase, Contracts, Billing and ERP uploading.
Quantification of Labour Qty of all construction activity and provide to Site, Contracts, Billing and ERP uploading.

3) Listing and updating :
Prepare Material Rate List and update it on time to time.
Prepare Labour Rate List and update it on time to time.
Derive and Maintain Qty constants, Material Constants of various construction activities.

4) Budget formation :
Rate Analysis of various work items wherever required.
Preparation of Activity Budget with help of Senior.
Prepare BOQ for initial & Final Budget.
Preparation Drawing & Assumption list used for Budgeting.
Incorporate changes in Budgets & Drawings as per site checking.

5) Verification & Reconciliation :
Jointly checking quantities with Site Engineer with specifications of all items and obtaining approval of concerned authorities on it.
Prepare reconciliation of all major items (as decided by Management) on completion of every mile stone. On site Area Verification.

6) Support & Coordination :

Architect Dept
Workout Design wastage for tiles it helps to redesigning and value addition.
Suggestion to reduce wall thickness.
Follow up for latest Drawing revision and specification

Contracts Department
Provide Area calculation to finalize contract for RCC Work.
Providing BOQ of all road construction activities to finalize work contract.

Support to Billing Department
Providing final quantities & area for billing purpose
Providing material reconciliation to debit/Rating contractor.

Support to ERP Department
Providing BOQ in ERP format to upload in system.

Support to Site
Providing BOQ of all construction activity.
Support to reconcile material.
Support to Quantity verification & finalization.
Providing material Quantity for indenting.
Coordination with site engineer for all QS related activity.
7) Supplementation :
To change all budgets as per site.
To change all budgets as per revised Drawings.
To change all budgets as per revised Specification.
To change all budgets as per revised labor & Material rates.
To change all budgets as per revised labor & Material activities.

8) Value engineering :
To compare all budgets as per working methods.
To compare Rate analysis of same activities with different working material & methods.
Workout Design wastage it helps to redesigning and value addition.
To check all drawings & suggest alternate changes to reduce cost.

9) Record Keeping & Updating :
Final area in soft copy.
Finalize quantities as per site in Soft & hard copy.
Reconciliation of various work items.
Monthly material stock audit.
All revised Drawings & Budgets.

10) MIS :
Maintain record keeping sheet.
Maintain Qty Status vs. Site Status Sheet.
Maintain Drawing requirement and its revisions.
Maintain reconciliation status Sheet.
Maintain Daily Progress Report.

11) Sign-offs :
Taking signoff from Site Engineer & Project Manager on final quantities.
Taking signoff from Site Engineer, Project Manager & Estimation Head on final Reconciliation sheet.

Company Profile

Client of PrimoHunt is engage --- development in and around Pune, which includes IT parks, residential apartments, roads and bridges, dams, etc.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs

PCB Testing Engineer in Pune
PCB testing,Test plan,Test Procedures,Equipment calibration records,R&D PCB testing
Siebel Developer
Siebel,telco,Siebel Configuration,CRM
PMO (EMP Lead)
Project Management,PMO